Home > News > Kailis Finger Jetties
Kailis Finger Jetties
MG Kailis Group
In 2024, Pelagic Group's 𝙅𝙈𝘾 𝙈𝙖𝙧𝙞𝙣𝙚 𝙂𝙧𝙤𝙪𝙥 (𝙅𝙈𝘾) was engaged by MG Kailis Group to replace the three existing timber jetties with three new, 30-metre, steel and Fiber-Reinforced Polymer (FRP) structures.
The scope of works included the demolition and disposal of the existing jetty structures, fabrication of the steel frames and fender systems, and the installation of the piles, frames and fenders.
With the help of our fabrication division, we were able to perform the entire scope in-house.